Force Main Replacement at Jupiter Ocean Racquet club. Approximately 1,500 lf of 4″ HDPE. Down hole wire line was required for this job.
Approximately 18,000 lf of directional boring, for ATMS (Advanced Traffic Management Systems). Project consisted of boring & trenching multiple conduits for Sarasota Public works.
ITS (Intelligent Transportation Systems), lighting and power. Project consisted of approximately 7,000 lf of 10″, various bores of multiple conduits, and innerduct in the greater Miami area. These bores were performed in highly congested and confined areas, highways, and main thoroughfares.
Sub-aquias bore of Hillsborough Bay, in Tampa, FL. Approximately 1,100 lf of 6″ HDPE, in coral rock at a depth of 90 feet.
Installation of 2-2" conduits approximately 5,000 lf by directional drilling in a high security environment.
Traffic signalization and roadway beautification project of approximately 19,000 lf.
References available upon request.